Weyerhaeuser的Trus坐了®工程木制品(EWP)和manbetx apk手机版定向股线(OSB)面板仅用于干燥使用服务应用1。像其他木材框架成员一样,这些产品将在典型的施工条件下耐湿地曝光,包括雨水暴露。但是,由于诸如扩展建筑延误,储存不当,洪水不当,洪水或建筑包络失败的条件导致的潮湿可以创造出显着的产品和安全问题。
Weyerhaeuser建议建设者在建造之前和期间保护所有EWP和OSB产品。对于卸载产品,请参阅产品运输,处理和储存适当处理和存储技术资源表。对于已安装产品但结构尚未“干燥”的情况下,Weyerhaeuser建议将该项目的设计专业人士咨询,以获得保护木材产品的适当方法。manbetx apk手机版设计专业人员可以考虑分期或排序结构以限制天气暴露。保护安装的木制品的一些方法包括:manbetx apk手机版
- 防止站立水剩余物品
- 覆盖/拖曳安装的产品以限制湿度曝光,但仍允许产品周围的空气运动
- 除非产品支撑,震动并支持,否则不会在木材框架上储存施工材料,以防止偏转。
Because each exposure scenario is unique and it is difficult to develop a universal rule to capture all situations, it is the responsibility of the project’s design professional or a qualified consultant (often a forensic engineer hired by the project manager) to determine the suitability of all wood products in question due to prolonged exposure. The project design professional or consultant has specific job knowledge regarding the demand on the affected wood products to be able to assess the overall performance of the framing members. Some considerations for the design professional or consultant to keep in mind are summarized inWeyerhaeuser工程木制品和面向股线的湿气效应manbetx apk手机版。
如果施工条件和曝光导致霉菌生长,产品可以根据EPA建议清洁产品,并应检查,以确保衰减尚未发生。看www.epa.gov/mold.有关清洗模具的信息。有关模具的附加信息可以找到关于模具的常见问题。
请注意,EWP和OSB产品保修不适用于延长曝光率导致的损坏。如有疑问,Weyerhaeuser建议更换风化产品。